R RCSC

Skip hire

Skip hire and waste carrier software

The yard on one screen. Every container that is out, how long it has been there, which highway permit expires on Friday, and a transfer note against the load it came off. Built for the way your yard already runs, hosted in the UK, and looked after by the people who built it.

A highway permit register listing each permit with its council, reference, skip and site, and the ones close to expiry flagged.
01

What a skip firm actually tracks

Five records, one container

  • Containers out, and days on site
  • Highway permits and their expiry dates
  • Transfer notes, EWC codes and weighbridge weights
  • The driver's run, marked off as it happens
  • Month end, without a memory test

Five records describing the same container, usually kept in five different places.

A yard system answers "where is that skip, and what is it costing us" without anybody going to find out. One container is one record: which size, whose site, the days it has been there, the permit that covers it and the note that came off it.

Plenty of firms run all of that on a spreadsheet, and it got them this far. Plenty more have software for part of it and a sheet for the rest, because the software never covered permits or notes. The question is whether the record is written as the work happens, or afterwards.

A first system might cover one yard. The same system two years on can carry three depots, subcontracted hauliers with their own logins, and the weighbridge feeding it.

02

What you would be looking at, in the order a day happens

Six screens from our own example system. Real screens rather than mock-ups, and every firm, job and site in them is invented. Yours would carry your towns, your sizes and your words for things.

A skip board showing every container that is out, how many days it has
                    been on site, the highway permit expiry and whether the waste transfer
                    note is attached.
First thing, the board. Every container that is out, on one screen: which skip, which size, whose site and the days it has been there. Past fourteen days it turns red, because that is a container that has stopped earning. Worth saying: a sheet shows what somebody last typed, and this shows what is true this morning.
A new booking form asking for the customer, the address, the container
                  size, the waste type, the delivery date and whether the skip is going
                  on the highway.
Then the phone goes. Customer, address, size, waste type, date, and whether it is going on the road. If it is, the permit is asked for while the booking is being taken rather than remembered later, which is the commonest way one goes missing. It is about as quick as writing it on a pad, because anything slower loses to the pad.
A driver's run sheet listing collections, deliveries and a tip stop in
                  time order, each with a tick button to mark it done.
The driver's run sheet. Today's collections, deliveries and the tip stop in the order they happen, with anything overdue at the top. It runs on the phone the driver already owns, and when a stop is marked done the office sees it at that moment. There is nothing to install, and it is less writing than the paper sheet was.
A highway permit register showing council, permit reference, the skip
                  and site, expiry date and days remaining, with expiring ones flagged.
Highway permits. Council, permit reference, which skip and which site, the expiry date and the days left on it. Amber at three days, red once it has gone, and every skip on the highway appears here off its own record. That is the difference between a register and a reminder, because the date reaches you.
A waste transfer note register listing note number, skip, producer and
                    site, waste type, EWC code, weight, weighbridge ticket and whether the
                    note is signed.
Waste transfer notes. One note per load, attached to the skip it came off: note number, producer, site, waste type with its EWC code, the weight off the weighbridge, the ticket, and whether it is signed. Anything missing is listed as missing, by name. Worth saying: captured this way, the digital record the rules ask for comes out of the work rather than a second project.
A reports screen showing average days on site by week, loads by waste
                  type, and containers currently on site by town.
And then the month. Average days on site, week by week, against the fourteen days where a skip stops earning. Loads by waste type. Containers on site now, by town. Average days on site tells you whether you need another twenty containers or the ones you own back sooner.
03

What the rules ask for

Digital Waste Tracking replaces paper waste transfer notes with a digital record of every movement, and it arrives in two phases. Operators of permitted sites that receive waste, which is a transfer station, a treatment site or a recycling facility, have been in since October 2026. Carriers, brokers and dealers follow from October 2027.

Which phase you are in depends on the yard rather than the fleet. A firm that tips at somebody else's site is in the second phase. A firm with its own permitted transfer station is a receiving site, so it is in the first, and that phase has already started. Plenty of firms hold that permit in another name, a sister company or a director's own, and it counts the same.

A record per movementNot per month and not per customer. Each load that leaves a site has its own entry, with the waste described by its EWC code rather than as "builders' rubbish".
Who had it, and whenProducer, carrier and receiving site, with the dates and the weight off the weighbridge. That is the trail a regulator follows.
Kept and producibleFindable when somebody asks, which is the part a folder in the cab fails at.

None of that is hard once it is captured as the work happens. It is only hard when it has to be reconstructed at the end of the month.

We build the records, not the legal advice. The phases and dates above are from the GOV.UK guidance on mandatory digital waste tracking, last updated 5 August 2026. Check your own obligations with the Environment Agency, and if a date moves we will say so.

04

Who it suits, and who it doesn't

Where this kind of system earns its keep

  • Containers going out of one yard or several
  • Skips on the public highway, so permits with dates
  • Your own permitted transfer station or treatment site
  • Drivers who need the same picture the office has
  • Reporting that gets assembled at month end

Where we fit best

A two-person yard can run well on a sheet for a long time. The system earns its keep once more than one person needs the same answer, which skip is where and which permit runs out on Friday, and a first step can be the board on its own.

If you already run skip software and everybody uses it, keep it. We build the part that sits beside it, the permits or the notes it was never built for, and join the two where it allows.

And if what you want is one system across weighbridge, accounts and payroll, that is a real project with a real budget, quoted as one.

Where it saves time, we build in AI features too: calls answered when the office is busy, with the postcode, skip size and date taken down as a booking to confirm, or a weighbridge ticket read in against the job. More on AI and automation.

Usually built alongside job and works tracking, scheduling and run sheets or compliance and inspection records. The rest are on the services page.

Ask about our free Business Systems Assessment

An hour with whoever runs the day to day. Clear recommendations to act on.

We look at how the work actually runs and what it runs on, then send you a list of what we would change, what each change would do for the business, and what it would take. In person or online, whichever suits you. Nothing to pay, nothing to sign.

  • One hour
  • In person or online
  • Recommendations we talk you through
Book a 20-minute callThe call arranges it. How it works
05

Honest answers

01
Does this make us compliant?
No system does that on its own. What it does is hold the records in the shape the rules describe, one entry per movement with the EWC code, the weights and the parties on it. The obligation stays yours, and the advice comes from the regulator.
02
Our tickets come off the weighbridge.
Then they carry on doing that. Where a weighbridge or an accounts package has an export or an interface, the weight and the ticket number land on the load itself, so nobody retypes a number that already exists.
03
My drivers won't use it.
They use a phone all day already. There is nothing to install, the run sheet is less writing than the paper one, and we take them through it before go-live rather than leaving you to explain it. If it needs explaining twice, it is built wrong.
04
How long does it take?
A first system is weeks rather than months, and bigger ones go live in pieces so the useful part arrives early. Scope, price and dates are agreed in writing before anything starts, with what is not included written as plainly as what is.
06

Talk to us

Tell us how the containers are tracked now and what you would want to see that you cannot. That is usually enough to say whether we can help.

0161 388 2444

Ring, 8am to 6pm Monday to Friday and Saturday mornings, or use the form below. Pick what you'd like to keep track of, add a line if you want to, and leave a name and a way to reach you.

Step 1 of 2What would you like to keep track of?

Takes about a minute. We reply the same working day.

Step 2 of 2Where should we reply?